Determine the location of the rack to be installed.By sliding the stud detector over the wall towards the required shelf position, find the wall stud in the required placement area, and find 2 The edge of the 4-foot stud and mark the position with a …

Determine the location of the rack to be installed.

By sliding the stud detector over the wall towards the required shelf position, find the wall stud in the required placement area, and find 2 × The edge of the 4-foot stud and mark the position with a pencil; Slide the stud detector in from another direction, find the other edge of the stud and mark the point. It may be necessary to move the desired position of the shelf to the right or short distance to the left of the position you initially placed.

Use a tape measure to measure between the two marks, find the middle of the stud and mark it.

Measure 16 inches through the wall, and use the stud detector, tape measure and pencil to find the next stud according to the same steps. Continue to measure another 16 inches through the wall and mark the stud. You have now marked three studs, with a total distance of 32 inches.

Keep the first standard at the mark in the middle of the mark stud above the wall. Position the standard at the height you want to support the shelf, and mark the position where the first hole in the standard contacts the wall.

Drill a 1/8 inch diameter hole, about 3 inches deep, through the wall and into the stud.

Drive a 2-inch long flat head screw with a diameter of 1/8 inch through the top hole and stud in the shelf standard.

Place the spirit level and standard of a 4-foot carpenter. Make sure that the standard is vertical, and drill another guide hole into the wall through the bottom hole in the standard.

Screw another screw into this new hole, then drill the remaining holes in the standard, and insert the screw through the holes in the standard and into the stud.

Related articles

  • The overflow filler will give the filling level through the depth of the return pipe in the container. Once the product reaches these pipes, it will pass through the pipe instead of continuing to fill the container. If you reach the overflow pipe with…
  • More and more companies are using automation to promote the improvement of production level and reduce the overall labor cost. The market demand for filling machines is on the rise. In recent years, with the increase of technological progress, the per…
  • In order to achieve high performance in industrial hydraulic systems, every component is critical. That is why companies all over the world rely on industrial valves to provide continuous and reliable performance in various industrial applications.Our…
  • Determine the location of the rack to be installed.By sliding the stud detector over the wall towards the required shelf position, find the wall stud in the required placement area, and find 2 The edge of the 4-foot stud and mark the position with a …
  • During the harsh daily business operation, industrial companies collect and produce a variety of goods, from large equipment and supplies to machinery and important business file boxes. For many industrial companies, space is an advantage. The manufac…

Product Center

Liquid packaging equipment

Powder packaging equipment

Full-automatic packaging line

News Information

Company News

Industry news

Tel: +86.519-8280-1281
Mail: suzy@sulepacking.com
Add: 11 Danfeng West Road, Dongcheng Street,Jintan District, Changzhou City, Jiangsu Province, China.
Copyright 2018-2023 Changzhou Sule Packing Technology Co., Ltd All rights reserved Design by: EastNet
Top